Contact
            Search
            Your Position:Home > News > Membrane Structure

            Several cases of membrane structure construction

            2015/10/16 10:38:53      view:3100
            1) Yu Ji and the designated person (4 to 8) shall be appointed for the routine inspection and maintenance of the process to ensure the smooth flow of the membrane surface and drainage equipment.
            2) strong winds, hail, heavy rain, snow and other severe weather process and process, the designated professional and technical personnel 4 on the project to stop the safety inspection, and timely eliminate hidden dangers,
            1 3 years after the completion of the project, 4 professional and technical personnel to check the film structure can be in normal working condition, check the contents include: film surface has no larger deformation, film surface can be caused by the loss of pre tension and relaxation, film surface can be partially torn, film coating can be stripped, and can not be loosened.
            4) as the membrane surface has large deformation, membrane surface due to pre tension loss and relaxation condition, making the two tension and timely implementation plan. 5) in case of membrane structure partial tear film material coating peeling condition should be repaired in time.
            6) if the case of the joint part of the situation of the loose, tighten or reinforce.
            7) regular training of the use of units within the warranty period to ensure that the use of units can be used normally.
            国产亚洲欧美另类一区二区三区|久久精品国产96精品亚洲|亚洲国产精品无码久久久久高潮|无码乱码在线观看性色|国产精品久久国产精品99|亚洲av无码国产丝袜在线观看|无码国产偷倩在线播放老年人